{"id":3061,"date":"2021-03-15T15:30:53","date_gmt":"2021-03-15T15:30:53","guid":{"rendered":"http:\/\/www.biosafety.kz\/?p=3061"},"modified":"2022-03-25T03:28:29","modified_gmt":"2022-03-25T03:28:29","slug":"%d0%b0%d0%ba%d0%b8%d0%bc-%d0%b6%d0%b0%d0%bc%d0%b1%d1%8b%d0%bb%d1%81%d0%ba%d0%be%d0%b9-%d0%be%d0%b1%d0%bb%d0%b0%d1%81%d1%82%d0%b8-%d1%81%d0%b0%d0%bf%d0%b0%d1%80%d0%b1%d0%b0%d0%b5%d0%b2-%d0%b1%d0%b5-2","status":"publish","type":"post","link":"https:\/\/biosafety.kz\/en\/uncategorized\/%d0%b0%d0%ba%d0%b8%d0%bc-%d0%b6%d0%b0%d0%bc%d0%b1%d1%8b%d0%bb%d1%81%d0%ba%d0%be%d0%b9-%d0%be%d0%b1%d0%bb%d0%b0%d1%81%d1%82%d0%b8-%d1%81%d0%b0%d0%bf%d0%b0%d1%80%d0%b1%d0%b0%d0%b5%d0%b2-%d0%b1%d0%b5-2\/","title":{"rendered":"AKIM OF ZHAMBYL REGION SAPARBAYEV BERDIBEK MASHBEKOVICH VISITED THE RSE &#8220;RESEARCH INSTITUTE OF BIOLOGICAL SAFETY PROBLEMS&#8221; OF THE SC MES RK"},"content":{"rendered":"On March 15, 2021, Akim of Zhambyl region Saparbayev Berdibek Mashbekovich, accompanied by Akim of Kordai district, representatives of KA-STROY LLP, Basis DorStroy LLP, visited the RSE RIBSP.<\/p>\n<p>During the visit, the process of construction of three 60-apartment buildings for employees of the RSE RIBSP was examined.<\/p>\n<p>Further, the construction site of the project &#8220;Construction of a biopharmaceutical plant for the production of immunobiological drugs that meet the requirements and standards of good manufacturing practice (GMP)&#8221; was presented to the attention of Akim of Zhambyl region Saparbayev B.M. The management of the construction company &#8220;Ka-Stroy LTD&#8221; LLP presented the current construction process, and also reported about the process of purchasing equipment for a biopharmaceutical plant.<\/p>\n<p>During a working visit to RIBSP, Akim of Zhambyl region Saparbayev Berdibek Mashbekovich on behalf of the President of the Republic of Kazakhstan Kassym-Jomart Kemelevich Tokayev congratulated the General Director of RIBSP Zakaria Kunsulu Daltonovna with the International Women&#8217;s Day on March 8!<\/p>\n<p><a href=\"https:\/\/biosafety.kz\/wp-content\/uploads\/2021\/03\/WhatsApp-Image-2021-03-16-at-19.43.23-1.jpeg\"><img decoding=\"async\" class=\"aligncenter wp-image-3073\" src=\"https:\/\/biosafety.kz\/wp-content\/uploads\/2021\/03\/WhatsApp-Image-2021-03-16-at-19.43.23-1-300x141.jpeg\" alt=\"\" width=\"382\" height=\"180\" srcset=\"https:\/\/biosafety.kz\/wp-content\/uploads\/2021\/03\/WhatsApp-Image-2021-03-16-at-19.43.23-1-300x141.jpeg 300w, https:\/\/biosafety.kz\/wp-content\/uploads\/2021\/03\/WhatsApp-Image-2021-03-16-at-19.43.23-1-768x361.jpeg 768w, https:\/\/biosafety.kz\/wp-content\/uploads\/2021\/03\/WhatsApp-Image-2021-03-16-at-19.43.23-1.jpeg 796w\" sizes=\"(max-width: 382px) 100vw, 382px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/biosafety.kz\/wp-content\/uploads\/2021\/03\/WhatsApp-Image-2021-03-16-at-19.19.37.jpeg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-3068\" src=\"https:\/\/biosafety.kz\/wp-content\/uploads\/2021\/03\/WhatsApp-Image-2021-03-16-at-19.19.37-300x200.jpeg\" alt=\"\" width=\"383\" height=\"255\" srcset=\"https:\/\/biosafety.kz\/wp-content\/uploads\/2021\/03\/WhatsApp-Image-2021-03-16-at-19.19.37-300x200.jpeg 300w, https:\/\/biosafety.kz\/wp-content\/uploads\/2021\/03\/WhatsApp-Image-2021-03-16-at-19.19.37-1024x682.jpeg 1024w, https:\/\/biosafety.kz\/wp-content\/uploads\/2021\/03\/WhatsApp-Image-2021-03-16-at-19.19.37-768x512.jpeg 768w, https:\/\/biosafety.kz\/wp-content\/uploads\/2021\/03\/WhatsApp-Image-2021-03-16-at-19.19.37.jpeg 1280w\" sizes=\"(max-width: 383px) 100vw, 383px\" \/><\/a><\/p>\n<p>During his working visit, Akim of Zhambyl region Saparbayev B.M. set a number of tasks to individual representatives of akimats, construction companies and RSE RIBSP.<\/p>\n<p><strong>Institute Administration<\/strong>","protected":false},"excerpt":{"rendered":"<p>On March 15, 2021, Akim of Zhambyl region Saparbayev Berdibek Mashbekovich, accompanied by Akim of Kordai district, representatives of KA-STROY LLP, Basis DorStroy LLP, visited the RSE RIBSP. During the visit, the process of construction of three 60-apartment buildings for employees of the RSE RIBSP was examined. Further, the construction site of the project &#8220;Construction [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/biosafety.kz\/en\/wp-json\/wp\/v2\/posts\/3061"}],"collection":[{"href":"https:\/\/biosafety.kz\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/biosafety.kz\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/biosafety.kz\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/biosafety.kz\/en\/wp-json\/wp\/v2\/comments?post=3061"}],"version-history":[{"count":10,"href":"https:\/\/biosafety.kz\/en\/wp-json\/wp\/v2\/posts\/3061\/revisions"}],"predecessor-version":[{"id":4284,"href":"https:\/\/biosafety.kz\/en\/wp-json\/wp\/v2\/posts\/3061\/revisions\/4284"}],"wp:attachment":[{"href":"https:\/\/biosafety.kz\/en\/wp-json\/wp\/v2\/media?parent=3061"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/biosafety.kz\/en\/wp-json\/wp\/v2\/categories?post=3061"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/biosafety.kz\/en\/wp-json\/wp\/v2\/tags?post=3061"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}